Terminal Live · All Berths Operational
Bcm / yrRegasification Capacity
BerthsCarrier Berths Operational
Live
/ MMBtuSpot Price · Live
29°21′12″N · 48°07′44″E · Mina Al-Ahmadi Deep-Water Terminal
Offtake Agreements · National Utilities · Trading Counterparties
Saudi Aramco
JERA Co.
Korea Gas Corporation
Naturgy
Enel Green Power
TotalEnergies
Shell LNG
BP Gas & Low Carbon
Equinor
Abu Dhabi National Energy
Petronas LNG
Chubu Electric
Saudi Aramco
JERA Co.
Korea Gas Corporation
Naturgy
Enel Green Power
TotalEnergies
Shell LNG
BP Gas & Low Carbon
Equinor
Abu Dhabi National Energy
Petronas LNG
Chubu Electric
Operations

Terminal Performance

Each metric leads. Click any card to expose the engineering architecture behind the number.

Primary KPI
24.5Bcm/yr
Annual Throughput
Contracted capacity across 14 long-term offtake agreements
Engineering Detail
Annual Throughput

Regasification Train Architecture

Four parallel regasification trains, each rated at 6.5 Bcm/yr. Seawater-heated open-rack vaporizers supplemented by submerged combustion for winter peak demand. Redundant compressor strings ensure 99.7% process availability.

Train 1–4: 6.5 Bcm/yr each Send-out pressure: 70–80 bar Vaporizer type: ORV + SCV hybrid
6Tanks
Storage Capacity
540,000 m³ total — full containment double-wall design
Engineering Detail
Storage Capacity

Cryogenic Storage Infrastructure

Six full-containment tanks, each holding 90,000 m³ at −162 °C. 9% nickel steel inner vessel, pre-stressed concrete outer shell. Design life 50+ years, last re-assessed Q3 2025 per EN 1473.

Individual capacity: 90,000 m³ Boil-off rate: 0.05%/day ISO 28460 · EN 1473 certified
ESG
98.4%
Boil-Off Recovery
BOG compressors re-inject to send-out stream; near-zero flaring
Engineering Detail
Boil-Off Recovery

Boil-Off Gas Management

High-speed reciprocating BOG compressors capture tank evaporation and recondense it into the send-out stream. Flare events are limited to planned maintenance windows — zero unplanned flaring in 847 consecutive operating days.

BOG compressor capacity: 4 × 12,000 Nm³/h Recondenser efficiency: 99.2% 847 days zero unplanned flare
26.5hrs
Vessel Turnaround
Average across Q-Flex and Q-Max class carriers, 2025 YTD
Engineering Detail
Vessel Turnaround

Berth Operations & Logistics

Four dedicated LNG berths handle vessels from 80,000 m³ to 266,000 m³. Articulated marine loading arms (4 × 16″ liquid + 1 × 12″ vapor return per berth) allow simultaneous unloading at 12,000 m³/hr combined throughput.

Max vessel draft: 14.5 m Loading arm: 4×16″ Liquid + 1×12″ VR Simultaneous unload rate: 12,000 m³/hr
ESG
3.2g CO₂e/MJ
Emissions Intensity
Lifecycle intensity — 34% below IEA LNG terminal benchmark
Engineering Detail
Emissions Intensity

Carbon & Emissions Profile

Terminal-scope emissions (Scope 1 + 2) measured at 3.2 g CO₂e per MJ delivered. Solar PV array (18 MWp) covers 40% of terminal auxiliary load. Participating in OGMP 2.0 Gold Standard methane monitoring programme.

Scope 1+2 intensity: 3.2 g CO₂e/MJ Solar coverage: 40% aux load OGMP 2.0 Gold Standard · ISO 14064
Reliability
99.7%
Process Availability
Rolling 36-month average — all regasification trains
Engineering Detail
Process Availability

Reliability & Maintenance Programme

Predictive maintenance using inline process sensors and vibration analytics on all rotating equipment. Planned shutdowns coordinated with offtake nomination windows. Last unplanned outage: 11 minutes, February 2024, upstream compressor isolation valve.

Planned downtime: <48 hrs/yr MTBF (rotating equip.): 8,400 hrs ISO 55001 Asset Management certified
Vessel Schedule

Berth Nominations72-hr window

Al Shamal
Q-Flex · Ras Laffan, QA
NOW
ETA
Maran Gas Coronis
Q-Max · Sabine Pass, US
+06:40
ETA
Gemmata
Conventional · Bonny Island, NG
+18:15
ETA
Methane Lydon Volney
Q-Flex · Bintulu, MY
+31:00
ETA
Mozah
Q-Max · Ras Laffan, QA
+48:20
ETA
Al Kharaana
Q-Flex · Sabine Pass, US
+62:00
ETA
Spot IndicesLive
JKM
Japan Korea Marker
$13.82/MMBtu
+0.34
TTF
Title Transfer Facility
$12.47/MMBtu
-0.12
NBP
National Balancing Point
$11.94/MMBtu
+0.08
HH
Henry Hub
$2.38/MMBtu
-0.03
For Active Negotiations

Swing volume & seasonal hedging discussion

Our trading desk maintains a 24/7 watch on all four hubs. Spot availability windows open 14 days ahead of berth.

Speak With Trading Desk
Infrastructure

Engineering Proof

The scale expressed in every metric above is anchored in physical infrastructure built to last five decades.

Regasification Process Flow
LNG CarrierQ-Flex / Q-MaxUnloading Arms4 × 16″ LiquidStorage Tanks6 × 90,000 m³BOG Compressors4 × 12,000 Nm³/hORV / SCVVaporizersPipeline Send-Out70–80 bar−162 °C → ambient temperature across 580 m process corridor
Technical Specifications
Terminal Commissioned2009
Total Site Area4.2km²
Berth Draft Allowance14.5m
Pipeline Send-Out Pressure80bar
Max Vessel Size266,000
Emergency Shutdown Response<0.8s
Certifications & Standards
ISO 28460
LNG Installations & Equipment
EN 1473
Installation & Equipment for LNG
ISO 55001
Asset Management
ISO 14064
Greenhouse Gas Accounting
OGMP 2.0
Gold Standard — Methane Monitoring
ISO 45001
Occupational Health & Safety
Berth Terminal — Capacity available from Q4 2026
Long-term offtake · Seasonal swing · Infrastructure concession